Detail

Boitwarder Groden South of Curved Rail Track

Address

Port Area of Brake
Nordstraße
26919 Brake

Object

  • abt. 23 ha of undeveloped surface area at the Boitwarder Groden with roads and rail access as well as access to the Nordpier (North Pier) and Niedersachsenkai
  • further development can be tailored to suit
  • the total area can be subdivided

Availability / type of contract

  • available immediately
  • as total area or subdivisions to suit
  • Erbpacht contract

Commercial utilization / zoning plan

GI / Gle / GE lt. B-Plan

Land use and zoning plan / construction

  • plot ratio 0.6 – 0.8
  • cubic index 10.0

Limitations

the height of buildings is restricted to 60 m

Target businesses

industries with an affinity to the port, commercial settlements, service providers

Road connection

  • Nordstraße
  • federal highway B 212 / B 211
  • connection to Autobahn via Wesertunnel A27, abt. 15 km

Rail access

  • direct access to the port rail, extendable
  • from there, access to the DB Fed. German rail network

Quay facility

  • Niedersachsenkai, abt. 1 km
  • Nordpier, abt. 800 m

Downloads

EU-Tender-Notice

Charcteristics

Object :

 

B25


Size :

 

abt. 23 ha


Buildings :

 

undeveloped


Availibility :

 

immediately


Exploration :

 

road and rail access, Nordpier (North Pier), Niedersachsenkai


Usage :

 

GI / Gle / GE lt. B-Plan


Virtual Tour

Your direct contact


Cornelia Stahnke
Head of Real Estate Brake
T: +49 (44 01) 925 - 150
cstahnke@nports.de

Headoffice


Dirk Leibfried
Head of Marketing & Sales
T: +49 (4721) 500-173
dleibfried@nports.de

Location

Distances

Airport (HB) abt. 60 km
City Center abt. 2,5 km
Bremen abt. 60 km
Bremerhaven     abt. 40 km
Hamburg abt. 185 km
Hannover abt. 190 km
Duisburg abt. 280 km