Boitwarder Groden South of Curved Rail Track
Address
Port Area of Brake
Nordstraße
26919 Brake
Object
- abt. 23 ha of undeveloped surface area at the Boitwarder Groden with roads and rail access as well as access to the Nordpier (North Pier) and Niedersachsenkai
- further development can be tailored to suit
- the total area can be subdivided
Availability / type of contract
- available immediately
- as total area or subdivisions to suit
- Erbpacht contract
Commercial utilization / zoning plan
GI / Gle / GE lt. B-Plan
Land use and zoning plan / construction
- plot ratio 0.6 – 0.8
- cubic index 10.0
Limitations
the height of buildings is restricted to 60 m
Target businesses
industries with an affinity to the port, commercial settlements, service providers
Road connection
- Nordstraße
- federal highway B 212 / B 211
- connection to Autobahn via Wesertunnel A27, abt. 15 km
Rail access
- direct access to the port rail, extendable
- from there, access to the DB Fed. German rail network
Quay facility
- Niedersachsenkai, abt. 1 km
- Nordpier, abt. 800 m
Downloads
- Exposé - Boitwarder Groden South of Curved Rail Track at Port Area of Brake - B25
- Information-Memorandum (Info-Memo) B25
- Enclosure II to Info-Memo: Lageplan B25
- Enclosure III to Info-Memo: Übersichtslageplan B25
- Enclosure VI to Info-Memo: Bebauungsplan Nr. 70
- Enclosure V to Info-Memo: Formblatt A - Teilnahmeantrag Bieter B25
- Enclosure VI to Info-Memo:Formblatt B - Teilnahmeantrag Bietergemeinschaft B25
EU-Tender-Notice
Charcteristics
Object :
B25
Size :
abt. 23 ha
Buildings :
undeveloped
Availibility :
immediately
Exploration :
road and rail access, Nordpier (North Pier), Niedersachsenkai
Usage :
GI / Gle / GE lt. B-Plan
Your direct contact
Cornelia Stahnke
Head of Real Estate Brake
T: +49 (44 01) 925 - 150
cstahnke@nports.de
Location
Distances
Airport (HB) | abt. 60 km |
City Center | abt. 2,5 km |
Bremen | abt. 60 km |
Bremerhaven | abt. 40 km |
Hamburg | abt. 185 km |
Hannover | abt. 190 km |
Duisburg | abt. 280 km |